ANIIDCO — Design, Build, Finance, Operate and Transfer of Megapode Resort

StatusAwarded
Official Designation

Design, Build, Finance, Operate and Transfer (DBFOT) of Megapode Resort at Sri Vijaya Puram through ANIIDCO

ANIIDCO — Design, Build, Finance, Operate and Transfer of Megapode Resort
Hospitality · Andaman & Nicobar IslandsRef. aniidco-design-build-finance-operate-and-transfer-of-megapode-resort
Client
ANIIDCO
Project Value
₹270.9 Cr
Construction Period
3 Years
Concession Period
50 Yrs (Incl. Construction Period)
Project Overview

Awarded by ANIIDCO under the DBFOT model, this project involves the design, construction, financing, operation and transfer of the Megapode Resort at Sri Vijaya Puram, Andaman & Nicobar Islands. Sheeraj holds a 50-year concession (inclusive of the 3-year construction period), delivering a premium resort that combines modern hospitality with the natural character of the island setting.

Scope of Work

  • 01Design and construction of Megapode Resort at Sri Vijaya Puram
  • 02Full DBFOT (Design, Build, Finance, Operate and Transfer) delivery model
  • 03Financing, project management and risk across the concession lifecycle
  • 04Hotel operations and asset management over the concession period
  • 05Civil, structural and MEP works to coastal-grade standards
  • 06Landscaping, utilities and sustainability infrastructure
Project Fact Sheet
Client / Authority
ANIIDCO (Andaman & Nicobar Islands Integrated Development Corporation)
Contract Value
₹270.9 Cr
Category
Hospitality
Location
Andaman & Nicobar Islands
Status
Awarded
Target Completion
50-yr concession
Client
ANIIDCO
Construction Period
3 Years
Concession Period
50 Yrs (Incl. Construction Period)

Sheeraj Projects Pvt. Ltd. · EPC Contractor

Site Documentation

From the field

2 photographs
ANIIDCO — Design, Build, Finance, Operate and Transfer of Megapode Resort — site view 1
ANIIDCO — Design, Build, Finance, Operate and Transfer of Megapode Resort — site view 2
Construction Sequence

Phases of delivery

01Phase 01

Award

LOA issued by ANIIDCO; DBFOT concession agreement executed

02Phase 02

Design

Architectural, structural and MEP design development

03Phase 03

Construction

Civil works, resort structures and coastal infrastructure

04Phase 04

Commissioning

MEP fit-out, landscaping and soft opening

05Phase 05

Operations

Hotel operations under the 50-year concession