SHEERAJ Projects Private Limited logoSHEERAJ ProjectsBUILDING ESTABLISHMENTS
000
Ring RoadsRajasthanTarget Completion Jun 2026

National Highway Authority of India — Construction of Two Number of Interchanges

StatusOngoing
Official Designation

Construction of Balance Works of Two Number of Interchanges at Jaipur Ring Road (NH-148C) from Tonk Road (NH-52) to Ajmer Road Section (NH-48), Rajasthan — National Highway Authority of India

National Highway Authority of India — Construction of Two Number of Interchanges
Ring Roads · RajasthanRef. national-highway-authority-of-india-construction-of-two-number-of-interchanges
State
Rajasthan
Highway
NH-148C
Project Value
₹107.29 Cr
Completion
June 2026
Project Overview

Construction of the balance works of two interchanges on the Jaipur Ring Road (NH-148C), connecting the Tonk Road (NH-52) and Ajmer Road (NH-48) sections of Rajasthan's capital. Executed for the National Highway Authority of India, the package delivers grade-separated interchanges, ramps, service roads and safety systems engineered to national-highway standards — easing through-traffic and unlocking orbital connectivity around Jaipur.

Scope of Work

  • 01Two grade-separated interchanges
  • 02Ramps & loop connectors
  • 03Service roads & cross-drainage
  • 04Road furniture, signage & lighting
  • 05Pavement & safety systems to NHAI spec
Project Fact Sheet
Client / Authority
National Highway Authority of India (NHAI)
Contract Value
₹107.29 Cr
Section / Stretch
Tonk Road (NH-52) → Ajmer Road (NH-48)
Category
Ring Roads
Location
Rajasthan
Status
Ongoing
Target Completion
Jun 2026
Highway
NH-148C
Completion
June 2026

Sheeraj Projects Pvt. Ltd. · EPC Contractor

Site Documentation

From the field

5 photographs
National Highway Authority of India — Construction of Two Number of Interchanges — site view 1
National Highway Authority of India — Construction of Two Number of Interchanges — site view 2
National Highway Authority of India — Construction of Two Number of Interchanges — site view 3
National Highway Authority of India — Construction of Two Number of Interchanges — site view 4
National Highway Authority of India — Construction of Two Number of Interchanges — site view 5
Construction Sequence

Phases of delivery

01Phase 01

Earthwork

Formation & embankment

02Phase 02

Structures

Interchanges & ramps

03Phase 03

Surfacing

Pavement & finishing

Work With Us

Planning a project of similar scale?

Our engineering and EPC teams partner with public authorities and private clients across highways, ring roads, canals and heavy civil works.