NHAI — Construction of 6-Lane Elevated Corridor

StatusAwarded
Official Designation

Construction of Six-Lane Elevated Corridors at Pigdambar Chauraha (KM 14.235) and Medicaps (KM 13.430), a Light Vehicle Underpass (LVUP) at Sirsodiya Junction (KM 61.660), and Flyovers at Dhanmod Bypass (KM 65.455) and Dhanmod Bypass End (KM 73.495), Indore, Madhya Pradesh

NHAI — Construction of 6-Lane Elevated Corridor
Bridges · Madhya PradeshRef. nhai-construction-of-6-lane-elevated-corridor
State
Madhya Pradesh
Authority
NHAI
Project Value
₹213.59 Cr
Duration
18 months
Project Overview

Awarded by the National Highways Authority of India, this Indore package delivers a series of grade-separated structures along the Pigdambar–Dhanmod corridor in Madhya Pradesh. The scope comprises six-lane elevated corridors at Pigdambar Chauraha (KM 14.235) and Medicaps (KM 13.430), a light-vehicle underpass at Sirsodiya Junction (KM 61.660), and flyovers at the Dhanmod Bypass (KM 65.455) and Dhanmod Bypass End (KM 73.495). Together the works untangle the corridor's busiest junctions and carry through-traffic clear of local movement, with a planned construction period of 18 months from the award of the Letter of Acceptance.

Scope of Work

  • 01Six-lane elevated corridor at Pigdambar Chauraha (KM 14.235)
  • 02Six-lane elevated corridor at Medicaps (KM 13.430)
  • 03Light Vehicle Underpass (LVUP) at Sirsodiya Junction (KM 61.660)
  • 04Flyover at Dhanmod Bypass (KM 65.455)
  • 05Flyover at Dhanmod Bypass End (KM 73.495)
  • 06Approaches, drainage, road furniture and safety systems to NHAI / MoRTH specs
Project Fact Sheet
Client / Authority
National Highways Authority of India (NHAI)
Contract Value
₹213.59 Cr
Section / Stretch
Pigdambar–Dhanmod — KM 13.430 to KM 73.495
Category
Bridges
Location
Madhya Pradesh
Status
Awarded
Target Completion
LOA awaited
Authority
NHAI
Duration
18 months

Sheeraj Projects Pvt. Ltd. · EPC Contractor

Site Documentation

From the field

5 photographs
NHAI — Construction of 6-Lane Elevated Corridor — site view 1
NHAI — Construction of 6-Lane Elevated Corridor — site view 2
NHAI — Construction of 6-Lane Elevated Corridor — site view 3
NHAI — Construction of 6-Lane Elevated Corridor — site view 4
NHAI — Construction of 6-Lane Elevated Corridor — site view 5
Construction Sequence

Phases of delivery

01Phase 01

Mobilise

LOA, survey & casting yard setup

02Phase 02

Substructure

Piles, pier caps & foundations

03Phase 03

Superstructure

Girders, deck & underpass

04Phase 04

Surfacing

Pavement, furniture & handover